Culford School

Project Breakdown

Architect:
Buttress, Fuller, Allsop Williams
 
Products Used:
Kawneer AA100 Curtain Walling, Kawneer AA120 Brise Soleil, Door Kawneer AA3720
 
Project Value:
£200k
 

Culford School, Bury St Edmunds, Suffolk

The Library was opened on 8th September 2015 and holds 10,000 books.

It has an 80 seat lecture theatre with the messanine floor exclusively for sixth formers.

 



« Medical Research Building NorwichSir Isaac Newton School, Norwich »