Beal High School

Design and Construction of a new building to accommodate 840 additional students at Beal High School in the London Borough of Redbridge.

The popular mixed community school, which caters for pupils aged from 11 to 18, was expanded from an eight form entry school to a 12 form entry, with the new facility accommodating Key Stage Three students. It features general and specialised teaching spaces, a learning resource centre, assembly hall and sports hall and the construction of external hard and soft landscaping.

Drayton Windows installed Kawneer AA100 Curtain Walling, AA541 Windows and AA605 + 190 doors.

Client:
London Borough of Redbridge
Main Contractor:
Morgan Sindall
Location:
London
Architect:
DLA Architects
Back to Projects