Cultural Centre, Southend Pier
Cultural Centre, Southend Pier in Southend-on-Sea was constructed off site at Tilbury Docks, Essex, transported by barge along the Thames to the Pier and craned into position with one barge crane.
It was glazed on site and the installers had to catch the visitors train at 07:30 hrs in the morning or walk the 1.3 mile to the site along the 100 year old pier.
Products Used:
- Kawneer 190 Main Entrance Doors and means of escape doors
- Kawneer AA605 Door
- Kawneer AA100 Curtain Wall zone drained
- Kawneer AA601 Casement windows all fixed light installed.
Client:
Essex County Council
Main Contractor:
Kier Eastern
Location:
Southend-On-Sea
Architect:
Sprunt Architects